Safety Impact of the Physical and Fluid-Dynamic Lengths of a Tunnel
This article focusses on the safety impact of partially open sections, built just before or after the "physical tunnel". The article provides some scenarios to which the calculation method can be applied.
-
Information sheet
- Date: 2018
- Author(s): DOMENICHINI Lorenzo / GUIA Salvatore / CAPUTO Flavio J.
- Domain(s): Road Tunnel Operations
- PIARC Ref.: RR378-033
- Number of pages: 6
-
This article has been published in the Routes/Roads magazine